Engineering Project: Upgrade and Transformation of Class 10,000 Clean Room
Project location: Suzhou
Construction time: August 2012
Construction plan: transform into a thousand-level clean room on the basis of the customer's original 10,000-level clean room, and add some additional clean areas. The new clean area is required to have the same level as the original upgraded clean area. accurate.
![]() |
![]() |
|
Newly added air-conditioning chiller for cooling of new air-conditioning unit | A new air-conditioning box unit is added to the original air-conditioning box. The two units operate independently. Part of the air flow of the new unit is used to newly expand the clean room, and part of the air volume is used to upgrade the clean room air volume. | |
![]() |
![]() |
|
Design two sets of air conditioning boxes to send and return air independently | Air conditioning box | |
![]() |
![]() |
|
Air conditioning box | The main air duct from the air-conditioning room to the clean workshop | |
![]() |
![]() |
|
Clean indoor return window | Newly added air outlet in clean room | |
![]() |
![]() |
|
Accurate air volume control in the mixing area ensures stable airflow in the clean room, accurate calculation of the return air ratio to meet functional requirements | ||
A thousand-level clean area is added. The floor is an anti-static conductive floor. Various facilities required for laying pipelines on the ground include power supply, various gas supplies, drainage, water supply, etc.